Solutions
New Construction and Renovation
Plan humidity control before ceilings close.
What you are seeing
Retrofitting ductwork after finishes are complete is disruptive and constrains the design.
Why it happens
Duct routes, service space, drainage and power are easiest to coordinate during the MEP stage.
The ONYX NOVA approach
We review drawings, agree unit locations and grille positions, and coordinate with the MEP contractor.
Technical note: Final equipment selection and expected performance depend on site conditions, system design, outdoor-air conditions and professional assessment.
Suitable product families
Product families typically considered.
Core
ONYX Core 48
Concealed ducted dehumidification and air treatment
View detailsCore
ONYX Core 70
Concealed ducted dehumidification and air treatment
View detailsCore
ONYX Core 120
Concealed ducted dehumidification and air treatment
View detailsAero
ONYX Aero 70
Fresh-air treatment, ventilation and dehumidification with total-heat recovery
View detailsAlpha
ONYX Alpha
Fresh-air ventilation with total-heat recovery
View detailsAura
ONYX Aura
Electrostatic air purification for compatible AC and fan-coil systems
View detailsRelated reading
Understand the background.
Why duct sizing matters for a concealed dehumidifier
A concealed unit performs as designed only when the ductwork it is connected to allows the intended airflow.
Read articleWhen should humidity control be planned during villa construction?
The most straightforward stage is while services are being coordinated, before ceilings close.
Read article